    Reporting to the Site-in-charge, the responsibilities will include:

     

    Planning the stores arrangement in consultation with the Project Manager / DGM/ Senior Site Engineer with rakes etc.

    Making the cement platform, where the cement is to be stacked with necessary safety precautions like enough Tarpaulins with 2-0” walling shaee around

    Stacking the cement date wise according to the receipts and keeping boards with dates and forward the dates to the Purchase department

    Issuing cement and recording the same as per the consumption

    Stacking the different grades of cements separately with necessary boards and dates

    Keeping records of receipt of cement and issue of different agencies / site to other site issues etc.

    Keeping the receipt records of steel diawise, item wise, with issues to agencies and from site to other sites

    Keeping the records of weighment slips of stocks received with approved signature of site-in-charge and also taking separate weighment from other agencies

    Keeping bin cards if computers are not provided

    Daily going round the site and supervising the way the contractors has stacked the cement, steel, etc.

    Recommend for recovery if the cement is wasted and clogged

    Preparing the intends of material required in consultation with Senior Engineer and follow up for the same with the Corporate Office

    Providing the daily stock position / issues etc. to the Senior Site Engineer / Billing Engineer and getting their signatures

    Submitting the list of surplus material lying at the site, if any, to the department heads / purchase on every 1st Tuesday of the month or earlier as required

    Inform the site-in-charge and the project engineer after receiving the material and update status board in site office

    Check the material on receipt for quantity, measurement, type, quality, make, damages, defects, duplications,etc.

    Inform the site-in-charge when the materials does not match the specifications 

    Arrange for labours for unloading of material after consultation with the site-in-charge and follow up with the Purchase department for pending indents

    Arrange for testing of material and prepare the testing reports after sending the copy of the same to the Head Office   

     